PE pipe at the time of installation, most buried in the ground, buried in the ground on how to ensure the PE pipe can be a normal work is a problem, which depends on the PE pipe buried the application of technology, let's look together.
First, the most important skills to function
PE pipe using BP, Borealis PE materials, the introduction of the world out of the production line with international advanced level, the use of spray cooling method makes average around cooling pipes, wiring method has adopted international advanced level of skill after wiring, water pipes, pipe fittings with all kinds of specifications Φ20 ~ 630mm, all kinds of pressure grade, specification complete, supporting intact.
Second, the combination of limitations and the use of premises
The primary is used for water supply, drainage, sewage and other walks piping systems, replacement of poor pipeline corrosion metal pipe within -60 ℃ ~ 40 ℃ temperature limitations of the use life of more than 50 years.